Newly Projects:Recent Projects

Development that leverages the unique characteristics and appeal of the region to further enhance its value.

We are working to address local challenges and develop urban development projects that envision the future, across the entire country.

Projectscompleted and opened in various locations across Japan

As a member of the NTT NTT Urban Solutions Group, we are working to solve various challenges facing local communities by making full use of the experience and know-how cultivated in the real estate business, as well as the NTT Group's resources in ICT, energy, and environmental technologies.

List ofcompleted and opening projects nationwide

Hokkaido area

    • office building
    • Hotel
    • Commercial facilities

    Urbannet Sapporo Link Tower/ HYATT CENTRIC Sapporo

    The building will have a standard floor area of over 1,650m2 and will be centered around rental offices that can be divided into up to 10 sections. Plans call for the opening of a full-service lifestyle hotel, the HYATT CENTRIC Sapporo, as well as plans for shops, an atrium, and a tenant-only lounge on the lower floors to create a vibrant atmosphere in the city. Aiming to create an incubation base for Sapporo, the south tower is planned to include co-working spaces, small offices, and an event lounge to promote interaction between diverse personnel.

    • CASBEE Sapporo (A rank)
    location
    Chuo Ward, Sapporo City, Hokkaido
    Transportation
    Subway Odori Station (6-minute walk), JR Sapporo Station (10-minute walk)
    scale
    26 floors above ground, 2 floors below ground
    Completion
    June 2026 (planned)

Tohoku area

    • office building

    Urbannet Sendai Central Building

    In the ever-evolving Sendai Central area, a new earthquake-resistant tower with approximately 480 tsubo (approx. 1,520 square meters) per floor has been built to meet the demands of new ways of working.
    We provide strong support from various angles to companies and office workers as they move forward towards the future.

    location
    4-19 Chuo 4-chome, Aoba-ku, Sendai City
    Transportation
    Subway "Sendai" Station (5-minute walk), Subway "Aoba-dori Ichibancho" Station (7-minute walk), JR "Sendai" Station (9-minute walk)
    scale
    19 floors above ground, 1 floor below ground
    Completion
    November 2023

Metropolitan area

    • Hotel

    Citadines Harbour Front Yokohama

    This hotel, operated by the Singapore Ascott Group, is directly connected to Nihon-Odori Station and is suitable for long-term stays.
    Many of the guest rooms are equipped with kitchens and offer views of the Bay Bridge and Mount Fuji.

    location
    5-2 Nihon-odori, Naka-ku, Yokohama City, Kanagawa Prefecture
    Transportation
    Directly connected to Nihon-Odori subway station.
    Number of rooms
    242 rooms
    Opening
    June 2023
    • office building

    Akasaka TRUST TOWER

    A lush, green mixed-use development project with 1,000 tsubo (approximately 3,300 square meters) per floor, featuring a hotel and historical and cultural facilities, this new landmark is set to be a landmark in the Akasaka area.

    location
    2-17-22 Akasaka, Minato-ku, Tokyo
    Transportation
    Direct underground connection to Tameike-sanno Station on the Tokyo Metro Ginza Line and Namboku Line
    Direct underground connection to Kokkai-gijidomae Station on the Tokyo Metro Chiyoda Line and Marunouchi Line
    scale
    43 floors above ground, 3 floors below ground
    Completion
    August 2024
    • Office
    • Commercial facilities

    HARAJUKU QUEST

    It will bring together a diverse range of stores that pursue the unique global Harajuku culture, and will reopen as a place where you can encounter things, experiences and people that you can't find anywhere else.
    We aim to create an exciting commercial facility where visitors can experience a wide range of creative works.

    location
    1-13-14 Jingumae, Shibuya-ku, Tokyo
    Transportation
    JR Harajuku Station (3-minute walk)
    Tokyo Metro Chiyoda Line/Fukutoshin Line "Meiji-jingumae (Harajuku)" Station (1 minute walk)
    scale
    6 floors above ground, 2 floors underground, 1 floor tower
    Completion
    August 2025

Kansai area

    • Hotel

    voco Osaka Central

    This is the first hotel in Japan for "voco," a hotel brand of IHG Hotels & Resorts.
    The open space adds vibrancy to the city and serves as a hub for business, tourism, and community interaction.

    location
    1-7-1 Kyomachibori, Nishi-ku, Osaka City, Osaka Prefecture
    Transportation
    Yotsubashi Line "Higobashi" Station (2-minute walk)
    Number of rooms
    Room 191
    Opening
    May 2023
    • office building
    • Commercial facilities

    Urbannet Midosuji Building

    Leveraging the NTT Group's unique combined strengths in "office buildings x ICT," we will create innovative workplaces where everyone wants to work, proposing a "new value for offices" that has never existed before.

    location
    4-2-13 Awajimachi, Chuo-ku, Osaka City, Osaka Prefecture
    Transportation
    Osaka Metro Midosuji Line "Yodoyabashi" Station (4-minute walk), Chuo Line "Honmachi" Station (3-minute walk)
    scale
    21 floors above ground, 2 floors below ground
    Completion
    January 2024
    • Commercial facilities

    GLION ARENA KOBE

    A multi-purpose arena with a capacity of 10,000 people, the largest in the Kansai region, developed by a consortium of three companies: NTT Urban Development, Smart Value, and NTT Docomo.
    It is also the first large-scale arena in Japan to obtain "ZEB Ready" certification.
    Located in a waterfront area surrounded by the sea on 270 degrees, this venue hosts a variety of events, including home games for the professional basketball team "Kobe Storks," music concerts, and MICE (Meetings, Incentives, Conferences, and Exhibitions) events.

    location
    2-1 Shinko-cho, Chuo-ku, Kobe City
    Transportation
    Shinki Bus "Arena-mae" or "G-Lion Arena Kobe" (1 minute walk)
    JR Kobe Line, Hankyu Kobe Main Line, Hanshin Main Line, Sannomiya Station (20-minute walk)
    Port Liner Port Terminal Station (13-minute walk)
    scale
    地上7階
    Completion
    March 2025
    • Commercial facilities

    Naniwa Palace Site Park (Northern Block) Development and Management Project / Nanoniwa

    With the business concept of "Minnanoniwa Naniwa Palace," we will develop parks and commercial facilities that will serve as a place of relaxation for citizens, while inheriting the history of Naniwa Palace.
    Furthermore, by supporting community activities and holding large-scale events, we will maximize the appeal of the entire area.

    location
    3-65 Babacho, Chuo-ku, Osaka City, Osaka Prefecture
    Transportation
    Osaka Metro Tanimachi 4-chome Station (1 minute walk from Exit 9)
    JR/Osaka Metro "Morinomiya" Station (15-minute walk)
    scale
    Ground floor (4 buildings)
    Completion
    March 2025
    • Hotel

    Patina Osaka

    The Capella Hotel Group, which is based on the concept of transformative luxury, is making its debut in Japan.
    This is a full-service hotel equipped with guest rooms, a spa, a restaurant, and other amenities.

    location
    3-91 Babacho, Chuo-ku, Osaka City, Osaka Prefecture
    Transportation
    Osaka Metro Tanimachi Line/Chuo Line "Tanimachi 4-chome" Station (approximately 8 minutes on foot)
    JR Osaka Loop Line "Morinomiya Station" (approximately 10-minute walk)
    Number of rooms
    Room 221
    Opening
    May 2025
  • Plan for the utilization of the former Shinmichi School site / Capella Kyoto
    • Hotel

    Capella Kyoto

    In Shinmichi area, which has continuously preserved the region's history and culture, we are developing accommodation facilities, community facilities, and a kabuki theater as an integrated project. This will allow us to pass on the town's memories and culture while simultaneously creating a vibrant new community.

    location
    130 Komatsu-cho, 4-chome, Shijo-sagaru, Yamato-oji-dori, Higashiyama-ku, Kyoto City, Kyoto Prefecture
    Transportation
    Keihan Main Line, Gion-Shijo Station (4-minute walk)
    Hankyu Railway Kyoto Line, Kyoto Kawaramachi Station (8-minute walk)
    Number of rooms
    89 rooms
    Opening
    March 2026

Chugoku area

    • Commercial facilities

    HiroPa

    Based on the Park-PFI (Public-Private Finance Initiative) system, we will develop a plaza and commercial facilities to create "ACTIVE COMMUNITY PARK," a new vibrant and relaxing space adjacent to Edion Peace Wing Hiroshima.

    location
    15 Motomachi, Naka-ku, Hiroshima City, Hiroshima Prefecture (part of Central Park)
    Transportation
    8 minutes walk from Hiroshima Electric Railway "Genbaku Dome-mae" tram stop
    10 minutes walk from Astram Line "Kencho-mae" station
    scale
    1st and 2nd floors
    Completion
    August 2024
    • Commercial facilities

    Hiroshima Prefectural Government Plaza (Shops & Cafes in front of the Prefectural Government Building)

    A new "everyday" that makes your heart flutter.
    A town square that will lift your spirits and delight your five senses.
    In the Motomachi area, where many people work and shop every day, a new relaxation spot will open that will update your daily work and leisure routine.

    location
    10-50 Motomachi, Naka-ku, Hiroshima City, Hiroshima Prefecture
    Transportation
    3 minutes walk from Hiroshima Electric Railway "Kamiyacho Higashi" tram stop
    2 minutes walk from Astram Line "Kencho-mae" station
    5 minutes walk from Hiroshima Bus Center
    scale
    West building: 1st floor, East building: 1st floor
    Completion
    March 2025

Kyushu area

    • Commercial facilities

    HAROW

    This is a mixed-use commercial complex consisting of two buildings: "HAROW Takachiho-dori" and "HAROW Hiroshima-dori".
    By utilizing commercial shops that visitors can enjoy, as well as event spaces and shared terraces that are continuous with the street, we aim to contribute to creating even more vibrancy in the central urban area of Miyazaki City.

    location
    HAROW Takachiho-dori: 1-5-13 Hiroshima, Miyazaki City, Miyazaki Prefecture
    HAROW Hiroshima-dori: 1-5-30 Hiroshima, Miyazaki City
    Transportation
    JR Miyazaki Station (7-minute walk)
    scale
    HAROW Takachiho-dori: 3 floors above ground
    HAROW Hiroshima-dori: 2 floors above ground
    Completion
    HAROW Takachiho-dori: January 2025
    HAROW Hiroshima-dori: November 2024